docs(features) #002 Status: recipe-backend Phase C: Planning, recipe-app Phase C: Planning #37

Merged
araemer merged 1 commit from 002-shopping-list-overview-previews-status into main 2026-10-03 17:14:50 +00:00
Owner

GATE B for spec 002 is passed: the repo architect verdicts are approved, and planning starts.

  • recipe-backend: Phase C: Planning. Two ADRs were approved; draft PR: araemer/recipe-backend#25
  • recipe-app: Phase C: Planning. No new ADR was needed, so there is no draft PR yet; it is opened at GATE C on branch 002-shopping-list-overview-previews.

This PR changes only the status lines of the spec.

🤖 Generated with Claude Code

GATE B for spec 002 is passed: the repo architect verdicts are approved, and planning starts. - `recipe-backend`: Phase C: Planning. Two ADRs were approved; draft PR: https://git.raemer.net/araemer/recipe-backend/pulls/25 - `recipe-app`: Phase C: Planning. No new ADR was needed, so there is no draft PR yet; it is opened at GATE C on branch `002-shopping-list-overview-previews`. This PR changes only the status lines of the spec. 🤖 Generated with [Claude Code](https://claude.com/claude-code)
docs(features) #002 Status: recipe-backend Phase C: Planning, recipe-app Phase C: Planning
All checks were successful
/ typecheck-contract (pull_request) Successful in 20s
6b6763c6ec
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
araemer/recipe-platform!37
No description provided.